Six slewing bearings for water treatment equipment in France
Lyon region, France — Rivelle Water Equipment SAS
Rivelle Water Equipment SAS, a manufacturer of centre-drive sludge scrapers for municipal and industrial water treatment, reordered six slewing bearings for two projects after installing four FW972-B units in 2025. The new equipment required continuous 24-hour service and a revised guard. Review of the updated duty data retained the bearing structure and mounting and gear interfaces, while revision C moved the grease ports and updated the maintenance documents. Two FW972-C units travelled by air and reached the customer’s workshop on 21 July 2026; four followed by sea and arrived on 15 September. Both batches met their agreed workshop arrival targets. Installation and commissioning feedback for all six was complete by 25 September, followed by an operating check on 20 October. This is a fictional training case.
Procurement list
| Product | Quantity | Time |
|---|---|---|
| FW972-C external-gear single-row four-point contact ball slewing bearing; 42CrMo rings; tooth-tip OD 972 mm × bore 740 mm × height 80 mm; external gear module 6, 160 teeth, 20° pressure angle, profile shift coefficient 0; inner-ring grease ports at 45°/225° from datum A | 2 units — FW972-2601 and FW972-2602 | Final inspection: 9 July 2026; FCA factory handover: 14 July 2026; air departure: 16 July 2026; Paris arrival: 17 July 2026; customer workshop receipt: 21 July 2026, ahead of the 10 August target |
| FW972-C external-gear single-row four-point contact ball slewing bearing; same approved revision C specification and maintenance annex MA-FW972-C | 4 units — FW972-2603 through FW972-2606 | Final inspection: 23 July 2026; FCA factory handover: 28 July 2026; Shanghai sea departure: 5 August 2026; Le Havre arrival: 10 September 2026; customer workshop receipt: 15 September 2026, ahead of the 18 September target |
The order advance was due after order confirmation and before production release. It was received on 1 June 2026, and production began on 2 June. The payment due for each dispatch was payable after acceptance of that batch’s inspection documents and before collection. First-batch documents were accepted on 10 July; the corresponding payment arrived on 13 July before factory handover on 14 July. Second-batch documents were accepted on 24 July; the remaining order balance arrived on 27 July before factory handover on 28 July.
Communication records
Tell Us What You Need.
Send your drawing, equipment details and operating requirements. Our team will review your inquiry and help clarify the bearing and supply scope.
- [email protected]
- Phone
- +86 5634113031
- +86 18098501069
- Address
- Ningguo Dadao, Ningguo Economic Development Zone, Ningguo, Xuancheng, Anhui, China
SWBTEC